2024 marks Ticehurst Village Hall's 125th Anniversary and the Grade 2 Listed Building is undergoing extensive renovations to restore it to its original glory.

After more than a century a series of practical (albeit ugly) changes to the internal layout and structure, extensive fundraising has allowed the first stages of the renovations to be completed.

The old bar has been stripped out revealing the original windows and brickwork, the lounge has been transformed into the Aston Webb Room and the main entrance corridors and doors have been restored.

The pictures below will demonstrate the incredible changes that have taken place in Phase 1 of the project.

The Bar and Lounge

East-Elevation
North-Elevation
West-Elevation
South-Elevation
pre-works-old-bar
Bar-2
barman
Rear-of-old-bar---hidden-wi

Above - The old bar and bar lounge before the renovations

Hall-Bar-under-construction

Stripped out bar revealing hidden windows and original parquet floor

New-Bar-2

New bar under construction and restored windows

Removal-of-suspended-ceilin

Removal of the lounge suspended ceiling

Suspended-ceiling-removed

Original ceiling structure revealed

window-hidden-behind-bar

Window hidden behind old bar

Door-hidden-by-plasterboard

Doorway hidden behind plasterboard

window-hidden-above-old-doo

Window hidden above old door

Hidden-window-during-resto

Window during restoration

new-section-of-window

New section of window

restored-window

Restored window

Bill-Talbot---pictures

Bill Talbot with painted window

Bill's-finished-window

Bill Talbot's finished window

New-bar

The new bar

Aston-Webb-Room

The Aston Webb Room

Video of the finished Aston Webb Room

Main Entrance and Corridor

In years gone by the vaulted entrance corridor had been removed completely and the doors replaced with "modern", cheaper alternatives. A critical part of the ongoing renovations is to restore the character of the building. This involved recreating the original vaulted corridor complete with parquet floor and new doors for the main entrance, the lounge and bar.

Old-front-door

Front door prior to works

original-front-door-inside

Front door prior to works

Original-door-frame-into-lo

Original door frame into lounge

Route-of-new-corridor

Prior to corridor construction

rebuilding-original-corrido

New corridor with vaulted ceiling

corridor-under-construction

Corridor under construction

new-doors-for-main-lounge-2

New doors into lounge

new-doors-from-main-lounge-

New doors in position

renewing-corridor-parquet-f

Relaying original parquet floor

Corridor-from-front-doors

Corridor from front door

New-front-door

New front doors

Corridor-and-parquet-floor

Completed corridor

Entrance-Lighting-800

New Entrance Lighting

Opening Ceremony - 21st June 2024

Team

Left : The main men. Ted Curley who did all the design work, Peter Reeves, chairman of the Trust, world renowned artist Bill Talbot and Neil from NOAHS builders

Right top : Cutting the ribbon - Adrian Drewe, grandson of Beatrice Drewe who in 1932 gifted the Village Institute and Recreation Ground to Ticehurst, Chairman Peter Reeves with a bottle of fizz to celebrate the occasion and our Caretaker, John Brooker.

Right bottom : Local residents gather for the Opening Ceremony for Phase 1 of the renovations to Ticehurst Village Hall.

ribbon-cutting